Some of TSG's most recent projects include the following:
Bakers Bay Golf and Ocean Club, Great Guana Cay, Bahamas.
Design, construction and operation of a 1.1 million gpd RO plant,
and a 60,000 gpd MBR wastewater treatment plant, expandable to 240,000 gpd,
to serve resort when completed. This contract also includes the design and
construction of the seawater supply, RO building, wastewater tankage and
storage for potable water and gray water.
Royal Island, Bahamas.
Design, construction and installation of a temporary 6,000 gpd RO plant
to serve resort until a permanent plant can be constructed.
CuisinArt Resort & Spa, Anguilla.
Design, construction and operation of an upgrade and expansion of an existing
RO plant to 150,000 gpd and an upgrade and expansion of an existing wastewater
treatment plant to a 120,000 gpd MBR wastewater treatment plant to serve the resort.
Temenos Anguilla, a St. Regis Retreat, Anguilla. Completed
the construction of a 1 MGD RO plant, expandable to 1.25 MGD,
which TSG is now operating. Currently in the process of designing
and will subsequently construct a new 120,000 gpd MBR wastewater
treatment plant, expandable to 180,000 gpd.
Viceroy Resorts and Residences, Anguilla. Design,
construction and operation of a temporary 25,000 gpd RO plant
during construction, and subsequently design and construct a
120,000 gpd RO plant, expandable to 240,000 gpd, and 100,000
gpd MBR wastewater treatment plant, expandable to 200,000 gpd,
to serve resort when completed.
La Vallee Development Corporation, Sandy Point,
St. Kitts . Completed the construction of a 1.25
MGD RO plant, which TSG is now operating.
Windermere Island, Bahamas . Design
and construction of 40,000 gpd RO plant, expandable to 60,000
gpd, a 10,000 gpd wastewater treatment plant, pumping systems
and distribution and collection systems.
Ambergris Cay, Turks and Caicos Islands . Design, construction and operation of a temporary RO plant and MBR wastewater plant for use
during construction, and subsequent design and construction of a 31,500 gpd RO plant, expandable to 150,000 gpd, and 60,000 gpd MBR wastewater treatment plant, expandable
to 180,000 gpd, to serve the resort.
Necker Island, BVI . Upgrade and
expansion of existing RO plant, installing spiral wound membranes
in place of the hollow fiber membranes previously used and increasing
the size of the plant from 53,000 gpd to 100,000 gpd.
Government of the British Virgin Islands, Tortola,
BVI . Contracted to design, build, own and operate
a 40,000 Igpd RO plant to provide the first water supply on
the island of Anegada.
Southlake Utilities, Inc., Orlando, Florida .
Hired to design and construct upgrades to existing water and
wastewater treatment plants, upgrading the existing 2.9 MGD water
plant and expanding the wastewater plant from 600,000 gpd to
1.5 MGD.
Jacksonville Electric Authority, Jacksonville,
Florida . Completed the design and permitting
for the first large scale MBR wastewater treatment plant in
the northern part of Florida, a 1 MGD, expandable to 2 MGD,
plant utilizing Kubota membranes.
Big Canoe Utilities Company, Inc., Big Canoe, Georgia .
Design and construction of a 1 MGD, expandable to 2 MGD, microfitration
surface water treatment plant.
|